Inverter oversizing check

Panel capacity against inverter capacity, measured against the limit for claiming STCs.

Array as a share of inverter capacity Within the 133% limit 132.0% 13.20 kW
Largest array allowed13.33 kW
Most panels at this rating24 × 550 W

How it's worked out

Panel capacity ÷ inverter capacity. Solar Accreditation Australia's requirements say the inverter's AC output may not be less than 75% of the array's peak power, so the largest array is the inverter's capacity ÷ 0.75: 133%.

Solar Accreditation Australia, Technical Requirements v1.9 (February 2026), clauses 4.1 and 4.2. Checked 21 October 2026.

Solar Base keeps every job on one record, from the first enquiry to the meter alteration, and does the portal work for you. See how it works

Why arrays are oversized

Panels rarely make their rated output: heat, angle and the time of day all take some off. A slightly larger array keeps the inverter near full output for more of the day, and fills the shoulders of the morning and evening, for the cost of a little clipping at midday.

Solar Accreditation Australia, whose requirements accredited installers work to on systems that claim STCs, caps how far it can go: the inverter's AC output may not be less than 75% of the array's peak power. That lets the panels reach a third more than the inverter: 133%.

Largest array = inverter capacity ÷ 0.75

Worked example

Panels24 × 550 W = 13.2 kW
Inverter10 kW
13.2 ÷ 10 = 132%Within the limit of 13.33 kW

Questions installers ask

Is this the same as the network's limit?

No. The distributor's limits on inverter size and export are separate, and a system has to meet both.

What happens over the limit?

The design does not meet the accreditation requirements, which puts its STCs at risk. Use a larger inverter or fewer panels.

Does a battery change it?

With a connected battery the 75% ratio can be exceeded, as long as the array stays within the inverter maker's maximum array size (clause 4.2).